top of page
Screenshot 2025-10-21 at 9.42.29 PM.png

TALIS

TALIS AT SYRINGA HEIGHTS | 4579 E PLUM RD

Talis is an expansive mountain estate envisioned as a legacy residence overlooking Lake Coeur d’Alene and representing the highest expression of craftsmanship within the Premier Collection by Gold Star Construction, Inc. Currently under construction with scheduled completion end of 2025, the home is set on approximately 3.77 private acres and designed to capture panoramic lake and mountain views from nearly every vantage point.

Spanning approximately 11,000 square feet, Talis blends timeless mountain architecture with modern refinement. Hand hewn timber trusses, Montana Chief Cliff stone, and radiant in floor heating establish a sense of warmth and permanence throughout the interiors. The layout prioritizes both privacy and hospitality, with a primary suite occupying its own wing, multiple guest accommodations, and open living spaces designed for seamless flow and connection to the outdoors.

The residence is designed for elevated everyday living and entertaining, featuring dual gourmet kitchens, a temperature controlled wine cellar, a dedicated wellness and fitness suite with sauna, an entertainment room, and an elevator serving all levels. Expansive outdoor living areas frame the surrounding landscape, while a heated pool and hydrotherapy spa extend the home’s focus on whole health living.

Integrated smart home technology allows intuitive control of lighting, climate, security, and entertainment, supporting both year round and seasonal living. A reserved boat slip at Hagadone Quick Launch Marina provides convenient access to Lake Coeur d’Alene, while proximity to town ensures ease without sacrificing privacy.

 

Every element of Talis reflects Gold Star Construction’s commitment to precision, material integrity, and thoughtful design. The result is a residence that feels enduring, intentional, and distinctly aligned with North Idaho’s most sought after lifestyle.

To follow the progress of Talis and view construction updates, visit Gold Star Construction, Inc. on social media.

Screenshot 2025-10-21 at 10.00.51 PM.png
MAIN_VIEW2 (1).png
MAIN_VIEW3.png

UNDER CONSTRUCTION - COMPLETION END OF 2025

INQUIRE FOR A PRIVATE TOUR

ARIA

ROKSANA

  • Instagram
  • Facebook
  • Youtube
bottom of page